Emory University & Georgia Tech Shared Offsite Ann

Emory University and The Georgia Institute of Technology constructed a shared high-density storage facility for circulating and special collections materials.

Precis performed mechanical, electrical, plumbing, and fire protection engineering on the project in two distinct phases including an MEP/FP Basis of Design and final detailed design followed by construction administration. Special design considerations included tight control of low temperature and humidity conditions to maximize the preservation index of the archival storage facility.

Precis was selected for this project due to its proven track record of successful projects involving critical environments.