Precis completed the design of a new process intensive BioPharm manufacturing facility. The project design consisted of the partial demolition of an existing structure and creation of a new multi-level building to provide space for process equipment and new central utilities.

The facility incorporates all functions necessary for sterile production including warehousing through filling. The processing areas are comprised of pre-engineered cleanroom modular panels with walkable ceilings.

The process rooms house multiple compounding systems which are followed by a fill line isolator and lyophilizers. Additional future processing spaces were integrated into the layout. All new central utilities including; new electrical service, steam, chilled water, and clean steam utilities were provided.

Highlights:

Process Intensive Design

New Manufacturing Space within Footprint of Existing Site