Precis led an in-house team of mechanical, electrical, plumbing, and fire protection engineers and coordinated with the owner’s architectural consultant for two new oral solid dosage manufacturing suites and two packaging suites (bottle and blister).

The project involved the installation of fluid bed dryers, granulators, bin blenders, bin lifts, drum lifts, bowl inverters, and tableting/compression machines. Key components of the project included:

  • Low-humidity HVAC systems
  • New 700-ton air-cooled chilled water plant
  • Dust collection systems
  • Coordination with AES wall and walkable ceiling system
  • Hot, recirculating purified water storage tank and piping system
  • HEPA-filtered supply and return
  • Wet pipe sprinkler system modifications
  • Segregated, cGMP-compliant process waste collection system with sealed trench and floor drains