Precis is part of the project team working to resolve a water damage issue, as a result of recent storms, at the Ursinus College Performing Arts Center in Collegeville, PA. An initial assessment of the project site indicated that a sanitary piping connection burst under the slab on grade floor, which caused erosion and lead to the slab settling. The project will require demolishing the floor slab and walls in the Costume Shop and Dance Studio to repair the damage and replace sanitary piping. Precis role on the project includes:
This project at Ursinus College is currently underway and is expected to be complete by mid-2022.