Riddle Memorial Hospital Chiller Plant Upgrade
Precis Engineering led an in-house team of mechanical engineers for upgrades to the main hospital’s central utility plant. Engineering design was preceded by a study of the existing 1,500-ton primary-secondary plant and analysis of return on investment (ROI) for different chiller options.